CompaniesScalewayMonthly reportsMay 2021
Scaleway in May 2021: incidents, uptime and changes
32incidents posted
13labelled major or critical
53.79%free of major/critical
22.09%free of any incident
0price changes
0notable page changes
Vendor-reported outage time 14.3 days, incident time 24.1 days. Derived from the incidents the vendor posted on its own status page, not measured by us. A minute counts as an outage minute when a major or critical incident (as the vendor labelled it) was open; incident minutes include minor ones too. Maintenance and incidents marked "no impact" are left out, overlapping incidents are merged, a resolved incident counts for at most 7 days, and one still open with no resolution counts for at most 24 hours. Last 90 days.
By vendor label: Major 13 · Minor 14 · No impact listed 5
Major and critical incidents 13
| Incident | Impact | Started | Duration | Status | Day |
|---|---|---|---|---|---|
| [WEBHOSTING] Platform 1000 | Major | 10 d | resolved | 05-01 | |
| [AMS] Lost an electric power feed | Major | 2.1 h | resolved | 05-05 | |
| [WEBHOSTING] Plateform 27 unavailable | Major | 16 h | resolved | 05-06 | |
| [DC5] Switch down in DC5 Room 1 Rack C64 | Major | 1.9 h | resolved | 05-09 | |
| [DC3] RPN switch down - Room 31 - Rack D10 | Major | 1.4 h | resolved | 05-10 | |
| [Hosting] Email delivery issue | Major | 3 d | resolved | 05-11 | |
| [DC3] Switch down in DC3 Room 31 Racks B4, B5 and B6 | Major | 2.5 h | resolved | 05-13 | |
| [DC2] Switch down in DC2 Room 205 Racks D8 | Major | 5.0 h | resolved | 05-13 | |
| [DC2] Room 205 - Rack A2 - Switch down | Major | 38 min | resolved | 05-14 | |
| Issue login in and with newly created access/secret keys on Object Storage | Major | 4 d | resolved | 05-17 | |
| [DC3] RPN switch issue in DC3 Room 31 Rack C11 | Major | 26 min | resolved | 05-18 | |
| [Webhosting] Platform issue | Major | 15 h | resolved | 05-18 | |
| [DC3] Room 4 - Rack E18 - Switch down | Major | 41 min | resolved | 05-28 |
Other incidents 19
Maintenance 11
Show scheduled maintenance
- [Scheduled] [DC3] Maintenance on our flow pump
- [Scheduled] [RPNv2] Maintenance on s46-a10.rpn.dc3 switch
- [Scheduled] [NL-AMS-1] API Unavailibility
- [Scheduled] [FR-PAR-2] Render-S Unavailability
- [Scheduled] [DC3] Pressurization maintenance
- [Scheduled] [DC5] Room 1 - Maintenance and testing on our cooling system
- [Scheduled] [DC3] Replacement of batteries bank
- [Scheduled] [DC3] Preventive mechanical maintenance of generators + load tests of generators
- [Scheduled] [Hosting] Maintenance on webmail classic
- [Scheduled] [Dedibox] AMS RPN fiber maintenance
- [Scheduled] [Elements] SSH keys API endpoint modifications
Cite this
Scaleway posted 32 status incidents in May 2021 (13 major or critical); 0 price changes and 0 notable page changes observed.
- Title
- Scaleway in May 2021
- Vendor
- Scaleway
- Date
- URL
- https://rewindex.com/company/scaleway/2021/05