Scaleway in January 2024: incidents, uptime and changes
19incidents posted
6labelled major or critical
36.31%free of major/critical
8.11%free of any incident
0price changes
0notable page changes
Vendor-reported outage time 19.7 days, incident time 28.5 days. Derived from the incidents the vendor posted on its own status page, not measured by us. A minute counts as an outage minute when a major or critical incident (as the vendor labelled it) was open; incident minutes include minor ones too. Maintenance and incidents marked "no impact" are left out, overlapping incidents are merged, a resolved incident counts for at most 7 days, and one still open with no resolution counts for at most 24 hours. Last 90 days.
By vendor label: Major 6 · Minor 13
Major and critical incidents 6
| Incident | Impact | Started | Duration | Status | Day |
|---|---|---|---|---|---|
| [DC5] Public switch issue in DC5 Room 1-1 Rack A49 | Major | 6 d | resolved | 01-01 | |
| [DC3] Public switch issue in DC3 Room 4-6 Rack B22 | Major | 1.2 h | resolved | 01-05 | |
| [AMS1/WAW3/AMS3] Debian and Ubuntu images aren't available | Major | 11 d | resolved | 01-08 | |
| Slowness and failures to push images on rg.fr-par.scw.cloud | Major | 3.0 h | resolved | 01-13 | |
| [DC2] Public switch issue in DC2 Room 103 Rack H4 | Major | 12 h | resolved | 01-16 | |
| [VPC] VPC is unstable in the Paris region | Major | 5 d | resolved | 01-19 |
Other incidents 13
| Incident | Impact | Started | Duration | Status | Day |
|---|---|---|---|---|---|
| [DC2] public switch issue in room 202B Rack 13 | Minor | 15 min | resolved | 01-07 | |
| Instabilities on api.scaleway.com | Minor | 5 d | resolved | 01-17 | |
| [S3] High PUT latencies on s3 in paris | Minor | 24 min | resolved | 01-18 | |
| [Webhosting]-Webmail impossible access | Minor | 1.9 h | resolved | 01-19 | |
| [Network]- Scaleway network unreachable from Egypt | Minor | 76 d | resolved | 01-19 | |
| [DC2] public switch issue in dc2, room 103, rack b15. | Minor | 21 d | resolved | 01-19 | |
| [DC5]-leaf down in room 7 rack D4 | Minor | 1.7 h | resolved | 01-19 | |
| [STORAGE] Latency on AMS-1 block storage | Minor | 23 h | resolved | 01-19 | |
| [DEDIRACK][NETWORK] - Switch down in DC2 room 206 | Minor | 18 d | resolved | 01-22 | |
| [DC2] - Switch down in DC2 room 101 rack N14. | Minor | 16 d | resolved | 01-24 | |
| API GW down in FR-PAR | Minor | 5.8 h | resolved | 01-24 | |
| [STORAGE] Lifecycle scheduled jobs not executing in fr-par | Minor | 21 h | resolved | 01-25 | |
| [DC3]public switch issue in dc3, room 44, rack A20 and A21 | Minor | 6.8 h | resolved | 01-31 |
Maintenance 14
Show scheduled maintenance
- [Scheduled] [NETWORK][DDX][RPN] Maintenance on s205-b2.rpn.dc2
- [DC5] DC on generators
- [Scheduled] [DC5] isolation of network devices
- [Scheduled] Maintenance on h6-6b73.rpn.ams1
- [Scheduled] Load balancer maintenance
- [Scheduled] [HOSTING] - Maintenance on pf-1004
- [Scheduled] [HOSTING] - Maintenance on pf1005
- [Scheduled] [HOSTING] - Maintenance on pf1006
- [Scheduled] [DC2] Hardware maintenance in room 101 - Racks K15 K16 K17
- [Scheduled] [Cockpit] - Maintenance on Mimir (Metrics)
- [Scheduled] [HOSTING] - Maintenance on pf1007
- [Scheduled] [WAW] Maintenance on RDB PostgreSQL instance
- [Scheduled] [DBAAS] - Patch PostgreSQL RDB instances on AMS datacenter
- [Scheduled] [DBAAS] infrastructure upgrade on PostgreSQL RDB PAR instances
Cite this
Scaleway posted 19 status incidents in January 2024 (6 major or critical); 0 price changes and 0 notable page changes observed.